Topsoe A/S, a project partner in the Nextfuel Biomethanol project, funded under EU Horizon program, has completed the Front End Engineering Design for the plant to be located on the west coast of Norway.
As part of Work Package 4 “Plant Design and optimization” Topsoe commenced the FEED after the Basic Engineering Design Package had been finished on 22. November 2024. During the FEED from November 2024 through May 2025 some 250+ engineering documents were generated by Topsoe and another 300+ engineering documents by Topsoe’s subcontractor for modular plant design. Jointly a sophisticated plant design including a 3D model was generated.

3D model rendering of the Nextfuel Biomethanol plant
During FEED some 25,000+ engineering hours were spent by Topsoe and the engineering carried out during FEED has enabled Topsoe to also present a firm bid proposal for the plant.
Nextfuel – Funded by the European Union’s Horizon Europe Research and Innovation Actions program under grant agreement No 101136225.